Federated States of Micronesia - Kosrae state 5 Grid Connected Solar Generators

Date modified: 15 February 2022

This documents consists of the technical specification for Lot 1 of FSM (Kosrae state).The purpose of the project is to deliver, install and commission 5 solar generators connected to the public grid, with a total peak power of 45.25kWp (+/- 5%). The Technical Specifications document defines the technical conditions for the supplying, installation and training related to the full implementation of the 5 grid connected solar generators (including construction of 1 car park shading structure). This report covers the work descriptions, hygiene, safety and work conditons, the technical documents that has to be provided by the tenderer and lastly, the technical specifications.

Data and Resources

Rating
Modified 2022-02-15
DCAT Type Text
Publisher Name
  • Pacific Island Forum Secretariat (PIFs)
  • European Union (EU)
Contact Point
  • Katerina Syngellakis, Etienne Sauvage